The AJ-50 foundation-free concrete batching plant began to work normally in the Philippines. This video describes the working process of the concrete production plant in detail.
1. The batching process of the batching machine: the loader adds stones, sand and gravel, and other aggregates into the batching machine for aggregate weighing and the proportion of the formula set by the control system. The model of the batching machine is PLD1600, which is composed of 3 bins. The Specs of the aggregate storage hopper is 8m³. The weighing system adopts a centralized weighing belt for weighing, which makes the weighing more accurate and fast, and improves work efficiency.
2, The feeding process of cement, fly ash, water, and additives. While the batching machine is batching, cement and other powders are batched in the cement silo; water and additives are measured at the same time;
3. In the conveying stage, you can see from the video that the weighed aggregate is conveyed to the weighing hopper through the hopper; powder materials such as cement and fly ash are conveyed to the weighing hopper through the screw conveyor; Open the control valve for water and additives to flow into the metering hopper. When the metering bucket meets the set formula, open the door of the metering bucket and the ingredients enter the concrete mixer;
4, In the mixing stage, the AJ50 batching plant is equipped with a JS1000 twin-shaft concrete mixer, which has high efficiency, short mixing time, and good quality of the mixed concrete. The mixed concrete is discharged into the concrete mixer truck and transported to various construction sites.